The District of Lillooet successfully reduced heating costs and greenhouse gas emissions by installing a modern biomass heating system at its Recreation Centre. The project replaced aging propane infrastructure with a high-efficiency wood pellet boiler supplied by Fink Machine, creating a reliable and sustainable energy solution for one of the community’s largest public facilities.
Project Overview
The Lillooet Community Biomass Energy Project (BEP) was developed to reduce energy costs, improve sustainability, and support the District’s climate action commitments. The project included the installation of a 400 kW biomass boiler, a 45-tonne pellet storage silo, and significant upgrades to the Recreation Centre’s heating distribution system.
The biomass system now provides approximately 80-85% of the facility’s heat demand while an existing propane boiler remains in place for peak loads and backup heating requirements.

The District of Lillooet Recreation Centre serves as a major community hub and includes:
- 25-metre swimming pool
- Hot tub and sauna
- Ice arena
- Gymnasium
- Weight room
- Meeting rooms
- Library
- Day care centre
- Sports fields
Prior to the biomass conversion, the facility relied almost entirely on propane heating, creating significant operating expenses and exposure to volatile fuel pricing.
Biomass Heating Solution
Fink Machine supplied and integrated a containerized biomass boiler system specifically designed for municipal and institutional heating applications.
System Components

- 400 kW KOB/PYROT biomass boiler
- 20-foot containerized boiler plant
- 45-tonne pellet storage silo
- Automated fuel handling equipment
- Integrated control system
- Existing propane boiler for backup and peak loads
The project transformed separate heating systems into a unified network, improving overall efficiency and reliability throughout the facility.
Project Challenges
One of the primary challenges was integrating two independent building heating systems. Additional mechanical upgrades were required to connect heat distribution networks and optimize energy use throughout the site.
The project also included:
- Removal of older heating equipment
- Removal of asbestos-covered piping
- Electrical upgrades
- Installation of new pumps and controls
- Mechanical room modifications
- Heat distribution improvements
Fuel Selection
The original project evaluated multiple biomass fuel options including locally available wood residuals and hog fuel. After further review, wood pellets were selected as the preferred fuel source because of their:
- Consistent fuel quality
- Higher energy density
- Reduced storage requirements
- Reliable supply chain
- Lower maintenance requirements
Today the facility receives approximately four to five pellet deliveries per year, with each delivery handled quickly and efficiently using automated unloading systems.
Performance Results
The biomass heating system now serves as the primary heat source for the Recreation Centre.
Operational Benefits
- Supplies 80-85% of annual heating demand
- Minimal operator involvement
- No additional staffing requirements
- Low weekly maintenance requirements
- Reliable operation through British Columbia winters
- Reduced dependence on fossil fuels
Financial Results
Project Investment
| Component | Investment |
|---|---|
| Biomass Boiler System | $312,000 |
| Building Upgrades | $207,000 |
| Engineering & Project Management | $111,000 |
| Taxes | $75,000 |
| Total Project Cost | $705,000 |
Annual Operating Costs
| Expense | Annual Cost |
|---|---|
| Wood Pellets | $31,000 |
| Propane | $11,000 |
| Maintenance | $6,000 |
| Testing | $4,000 |
| Total Annual Cost | $52,000 |
| Previous Heating Cost | $78,000 |
| Annual Savings | $26,000 |
Return on Investment
The District of Lillooet achieved impressive financial performance from the project.
- Annual savings of approximately $26,000
- Biomass boiler payback of approximately 5.4 years
- Entire project payback of approximately 9.2 years
- Reduced exposure to future propane price increases
- Long-term operational savings for taxpayers
Environmental Benefits
By switching from propane to biomass heating, the District of Lillooet significantly reduced its carbon footprint while demonstrating leadership in renewable energy adoption.
The project supports:
- Lower greenhouse gas emissions
- Reduced fossil fuel consumption
- Improved community sustainability
- Support for local bioenergy development
- Long-term climate action goals
Lessons Learned
The project demonstrated several important principles for successful biomass heating projects:
- Early stakeholder engagement is essential.
- Proper integration between heating systems is critical.
- Fuel quality management directly impacts performance.
- Biomass systems can be successfully implemented in municipal recreation facilities.
- Containerized boiler plants simplify installation and reduce project risk.
Why Choose Fink Machine?
Fink Machine has supplied more than 200 biomass heating systems across Canada, helping municipalities, hospitals, schools, housing providers, and commercial facilities reduce energy costs while lowering carbon emissions.
Our turnkey services include:
- Biomass boiler supply
- Fuel handling systems
- Containerized boiler plants
- District energy systems
- Engineering support
- Installation and commissioning
- Training and service support